苏州菩阂教育科技有限公司

NHI Headlines

NHI’s TBM creates a successful open for the extension line between Beijing and Tianjin

Published:2015-04-07

Recently, that the Φ11.97m slurry balance TBM calledNO. 45 of SHMG emerged through 18 months work. It marks the successful open for the extension line between Beijing and Tianjin, which is the national key construction project in China.

The full length of the extension line between Beijing and Tianjin is 44.815 kilometers, for the only one TBM tunnel with 2.8 kilometers; the Φ11.97m bentonite slurry balance TBM with air cushion type from our company is used in the part of 2.25 kilometers. The installed total power of the equipment is 3960kw. The length of main body is 50 meters and the weight is 1300 tons.

It creates another successful achievement after that NHIs TBM is used in the national projects of high-speed rail SHIZIYANG tunnel between Guangzhou and Shenzhen, Wuhan river tunnel as the first tunnel of Yangtze River, the railway underground line for Beijing and Tianjin in China. 

滁州市| 临汾市| 贵定县| 禹城市| 屯留县| 河南省| 长葛市| 延庆县| 正定县| 遂川县| 大港区| 南川市| 修水县| 寿宁县| 定远县| 垫江县| 田阳县| 蓬莱市| 重庆市| 永州市| 金华市| 孟津县| 常熟市| 峨眉山市| 大石桥市| 千阳县| 胶南市| 根河市| 信阳市| 宣威市| 水城县| 伊宁县| 山东省| 青州市| 河间市| 贞丰县| 八宿县| 黎川县| 隆林| 鹤庆县| 宝兴县|